We cannot change your cookie settings at the moment because JavaScript is not running in your browser. To fix this, try:
Battery Approved Treatment Operators - Portable
This record is for Approval for Access product AfA334. These data contain details of Treatment Operators Approved for Portable batteries under the Producer Responsibility Regulations for Batteries...
WFD Groundwater Operational Catchments Cycle 2
WFD (Water Framework Directive) Groundwater Operational Catchments (Cycle 2) show how WFD work is grouped geographically for practical management purposes. The Groundwater operational catchments...
WFD Artificial Water Operational Catchments Cycle 2
WFD (Water Framework Directive) Artifcial Water Operational Catchments (Cycle 2) show how WFD work is grouped geographically for practical management purposes. The Artifical Water Operational...
WFD Surface Water Operational Catchments Cycle 2
Operational catchments are a way of grouping WFD waterbodies together for the purposes of economic appraisal. Every waterbody has been assigned to an Operational catchment. They are not always...
Battery Approved Treatment Operators - Industrial and Automotive
These data contain details of Treatment Operators Approved for Industrial and Automotive batteries, under the Producer Responsibility Regulations for Batteries 2009.
Performance Dashboard Waste: generic operator returns
This dashboard shows information about how the Waste: generic operator returns service is currently performing.
This is a "beta" service. The dashboard shows number of digital transactions, total...
Performance Dashboard Generic operator returns: water abstraction
This dashboard shows information about how the Generic operator returns: water abstraction service is currently performing.
This is a "beta" service. The dashboard shows number of digital...
Annual CO2 emissions from regulated aircraft operators
Annual emissions of carbon dioxide from aircraft operators regulated under the EU Emissions Trading Scheme and assigned to the UK (data for England only).
Eradication England - Ruddy Duck Control Operations and Counts
This dataset includes information on site visits carried out as part of the UK Ruddy Duck Eradication Programme which began in September 2005. It includes details of all visits, some of which were...
Ruddy Duck Control Trial Data 1999-2002 - Control Operations and Counts
This dataset includes information on site visits carried out as part of the UK Ruddy Duck Control Trial which ran from 1999 to 2002. It includes details of all visits when Ruddy Ducks were culled,...
Water Framework Directive (WFD) Surface Water Operational Catchments Cycle 3
This is a polygon dataset showing Surface Water Operational Catchments, created to meet the requirements of the Water Framework Directive (WFD). Operational Catchments are larger than catchments...
Annual CO2 emissions from regulated installation operators
Annual emissions of carbon dioxide equivalent from installation operators in England regulated under the EU Emissions Trading Scheme holding a Greenhouse Gas Emissions Permit.
WFD Catchment Management Information England - RBDs and Catchments Cycle 2 - River Operational Catchments
WFD Catchment Management Information England - RBDs and Catchments Cycle 2 - River Operational Catchments. This dataset sets out the different units used for managing the Water Framework Directive...
National Control Plan for Salmonella Chicken Breeder Flocks Operator Sampled England 2015
This dataset details the chicken breeder flocks in England where official routine sampling, under the National Control Programmes for Salmonella, was carried out by Animal and Plant Health Agency...
National Control Plan for Salmonella Chicken Breeder Flocks Operator Sampled England 2012
National Control Plan for Salmonella Chicken Breeder Flocks Operator Sampled England 2014
National Control Plan for Salmonella Chicken Breeder Flocks Operator Sampled England 2013
Performance Dashboard Applications for Section 36 consents, required for the construction, extension or operation of electricity generating stations
This dashboard shows information about how the Applications for Section 36 consents, required for the construction, extension or operation of electricity generating stations service is currently...
2023 Waste Data Interrogator
Three resources are available on this record for 2023:
2021 Waste Data Interrogator
Three resources are available on this record for 2021:
Showing 1 - 20 of 1298