We cannot change your cookie settings at the moment because JavaScript is not running in your browser. To fix this, try:
25 Year Environment Plan Outcome Indicator E7: Healthy soils – proposed method for a soil health indicator for England
This report outlines a proposed method for a soil health indicator for England. It is planned that this method will be used to produce results for use against the 25 Year Environment Plan’s Outcome...
25 Year Environment Plan Outcome Indicator E7: Healthy soils – Progress report
Healthy soils are critical for the delivery of ecosystem services such as food production, water regulation, biodiversity support, and carbon storage. Maintaining soil health is crucial for soils...
Phytophthora Austrocedri Confirmed Infection Sites GB 10K Grid
The dataset identifies confirmed infections of Phytophthora austrocedri in Great Britain.
P. austrocedri is a species of Phytophthora that was only recently ‘described’ (in 2007), although it is...
Inputs of mercury, cadmium and lead via water and air to the Greater North Sea between 1990 and 2014
The data shows the input loads of mercury, cadmium and lead via water and air to the Greater North Sea between 1990 and 2014. The data are separated by input loads from the UK, the OSPAR...
Green Infrastructure Areas for the Black Country (GIBC)
Overview The Green Infrastructure Areas for the Black Country (GIBC) data identifies green infrastructure, green infrastructure function (or ecosystem service) and pinch point mapping for the Black...
Showing 1 - 5 of 5